Overview
Control is a description of how the plant behaves
A control panel is only as good as the document behind it. Two panels can look identical from outside and behave completely differently inside. One follows the process, the other follows a template.
We build from the sequence: what starts first, what interlocks with what, which signals go to the PLC, which go to the local panel, where the emergency stop sits and what the operator sees.
That means the I/O list matters more than the enclosure. We work through it with you, then assemble, wire and test to it. We also tell you where the document is silent, so the decision stays with you.
- PLC and remote I/O panels
- Motor control centres
- VSD and soft-starter panels
- Instrument and junction panels
- Local operator stations
- Process and skid panels
Relays, contactors and terminals laid out to the schematic, with every core numbered.
Typical project requirements
The five documents that decide the panel
01
I/O list
Digital and analogue points, signal type, voltage and the device each point belongs to. The list is the panel.
02
Control philosophy
Start and stop sequence, interlocks, permissives, alarm handling and what happens on power failure.
03
Load and motor list
Motor ratings, starting method, duty, protection and whether drives are used.
04
Component vendor list
The brands your client approves for breakers, contactors, PLC, drives, terminals and enclosures.
05
Interface schedule
What connects to the panel and how: field cables, Ethernet, fieldbus, remote I/O and the upstream system.
06
Site and testing
Ambient conditions, panel location, and the factory acceptance test you want to witness or receive as a record.
Recommended equipment
Panel types we assemble
Control panels are project equipment, not catalogue products: they are assembled to the documents above. Ask for the product page if you need the distribution side: low voltage switchgear is the type-tested range.
Technical considerations
Where control projects usually go wrong
Customisation
Adapted to the plant, not to a template
Layout and dimensions
Panel size and internal arrangement set by the number of devices, the cable entry and the space available on site.
Operator interface
Pushbuttons, selector switches, HMI, indication lamps and emergency stop arranged to the operating procedure.
Brands and standards
Components from your approved list, with wiring and identification to the standard your client specifies.
Communication
Ethernet, Modbus, Profibus or remote I/O, with the point list agreed before the devices are ordered.
Enclosure and climate
IP rating, cooling, heating, sun canopy and finish for indoor plant rooms or outdoor installation.
Documentation set
GA drawing, schematic, terminal list, device list and test record, issued in the format your project uses.
Related
Pages worth reading next
Have an I/O list and a sequence?
Send them with the panel schedule. We will come back with the layout, the component list and the points that still need a decision.